Kappel-Faas

2013

  • Rhineland-Palatinate, Rhein-Hunsrück-Kreis, Kastellaun, Kappel
  • 2 x E-82 E2 (2,3 MW)

Kappel-Faas Wind Farm

The Kappel-Faas wind farm was acquired from the FUTURA Group as a turnkey installation in 2013. The two Enercon E-82 E2 wind turbines are located directly on the cable route between the Kappel wind farm and DunoAir’s own substation in Mastershausen which is why DunoAir’s takeover of the Kappel-Faas wind farm was particularly opportune.

Environmental balance

Estimated yield

11.5 million KWH

So2 Savings

5,900 tons

Co2 Savings

6,000 tons

Production

Electricity for 2,900 3-persons households