Kappel-Faas Wind Farm
The Kappel-Faas wind farm was acquired from the FUTURA Group as a turnkey installation in 2013. The two Enercon E-82 E2 wind turbines are located directly on the cable route between the Kappel wind farm and DunoAir’s own substation in Mastershausen which is why DunoAir’s takeover of the Kappel-Faas wind farm was particularly opportune.
Environmental balance
11.5 million KWH
5,900 tons
6,000 tons
Electricity for 2,900 3-persons households